Going Digital Awards in
Infrastructure for
Geotechnical Engineering
Sheet Piling Tailings Dam
in the Doce River
Terratek
Ponte Nova, Brazil
Project Playbook: PLAXIS
Read more
Category
Previous
Next
Search
Water, Wastewater, and Stormwater Networks
Water and Wastewater Treatment Plants
Utilities and Industrial Asset Performance
Utilities and Communications
Structural Engineering
Roads and Highways
Road and Rail Asset Performance
Reality Modeling
Rail and Transit
Project Delivery Information Management
Power Generation
Mining and Offshore Engineering
Manufacturing
Land and Site Development
Geotechnical Engineering
Digital Construction
Digital Cities
Buildings and Campuses
Bridges
2021 Going Digital Awards for
Advancements in
Digital Twins
ES(D)G
Founders' Honorees
Future Infrastructure Star Challenge
All categories
By country
By category
By company
Digital Twin Gallery
ES(D)G Gallery
When the Fundão Dam failure led to tailings being deposited near the Candonga Dam that stopped operations at the Candonga Hydroelectric Power Station, three sheet piling walls had to be designed to dredge the tailings. Terratek was responsible for performing numerical analysis on one of the walls and simulating the tailings excavation to obtain horizontal displacements. The project presented complex geometry and many finite elements and stress points, resulting in a model rendering the calculation time impractical. They needed flexible modeling software capable of handling the voluminous model elements and calculations.
They selected PLAXIS to model the soil behavior and wall, and determined the wall presented large horizontal displacement reaching 800 millimeters on the top. The 3D modeling and analysis results led to a design update for a proper instrumentation system to predict wall failure. The project demonstrates the importance of using accurate 3D modeling technology to predict structural behavior and facilitate design of a monitoring scheme.
Going Digital Awards in
Infrastructure for
Geotechnical Engineering
Sheet Piling Tailings Dam
in the Doce River
Terratek
Ponte Nova, Brazil
Project Playbook: PLAXIS
Watch video
Read more
Category
Previous
Next