Located along the Woken River in Heilongjiang, the Taoshan Lake ecological, environmental, and water conservancy initiative creates a wetland ecological culture, promoting tourism and leisure. The project area covers over 6.5 million square meters within a narrow, complex construction site. Consultants had to coordinate multiple disciplines amid a short construction period, realizing the imperative need for an integrated and collaborative construction technology solution.
After evaluating several applications, they selected ContextCapture and SYNCHRO 4D. The Bentley solutions helped them to create a 3D model of the construction area, linking the demolition and construction sequences. The digital solution reduced construction time by 40% to achieve delivery 240 days ahead of schedule and save over CNY 60 million. Leveraging BIM, engineering quantity, and environmental data in a digital platform helped leverage intelligent control, reducing costs associated with human error by over CNY 2 million. Through SYNCHRO’s data processing, they improved communication and task execution while reducing overall costs.